Episode five of the podcast is a solo one. Johan is off this week, so Rich Summers takes the mic alone to walk through something the Lets Flo team has been refining for years: how to calculate exactly what studio chaos is costing a business, in real pounds and hours, not just in frustration.
Before diving in, Rich looks back at Episode four, where Alison joined from New York to talk through scaling the Net-a-Porter studio from 30 people to over a hundred. Her core insight sets up everything that follows in Episode five. Scale up a team or a production line without fixing the underlying problems first, and all you have done is scale up the problem. If you have not listened to the conversation yet, it is worth going back for.
Where the methodology comes from
The story behind this episode goes back to how Lets Flo started. The very first studio the team worked with was one of the UK's most prestigious fashion brands, a curation, runway show led business where quality could never be compromised, even as the business pushed to ramp up volume. Rich was expecting something closer to the set of Zoolander. What he found instead was a group of highly motivated, highly creative people struggling to keep up, not because they lacked skill, but because of how the work moved between them.
What was meant to be a two week engagement turned into a year embedded in the studio. The pattern that emerged became the foundation for everything Lets Flo does today. Every team had its own version of the truth. Merchandising had a master spreadsheet. Sample tracking had another, often copied from the first. Stylists worked from their own files and a stack of keynote decks. The studio manager ran a separate tracker for freelancers, reshoots, and studio space. None of these tools were bad on their own. The real cost showed up in the handover between teams, in the constant back and forth needed just to keep everyone on the same page. Rich named this cost the Studio Tax.
What the Studio Tax actually looks like
The clearest example from the episode comes from merchandising. A product launch is days away, and the team needs status on twenty products. They email the sample coordinator, the styling manager, the studio manager, the art director, and the post production lead. Each person has to stop what they are doing, check their own spreadsheet, and reply. Four products have not arrived yet. A few are being shot that day. Others are still in post production or waiting on sign off. Nobody had a shared, live answer to a question that should have taken seconds.
The same pattern repeats itself across the studio in ways easy to miss until someone adds them up. Rich describes a junior stylist, since promoted to head stylist, who spent more time typing codes into a spreadsheet and photographing outfits for a keynote deck than actually styling. A photography team dedicated an hour at the end of every shoot day purely to renaming and organizing files, time with nothing to do with the craft they were hired for. When a missed shot only surfaces after the model has gone home, the studio is left paying to rebook talent it should never have needed to rebook.
None of this points to a people problem. The people in these studios are, almost without exception, organized and talented. The problem is coordination, and every point where coordination breaks down adds another small cost. Left unaddressed, those costs compound. A delay in sample management pushes a shoot later, which pressures art direction and post production, which drives up retouching costs through rush fees, which increases the odds of an error creeping back into the process. Rich calls this the blame spiral, and he has watched it play out the same way in studio after studio, usually landing hardest on whichever team is last in the chain.
Why a number matters more than a feeling
Most studio leaders already sense where the inefficiencies live. The harder part is translating instinct into something the rest of the business will act on. Stakeholders outside the studio, in finance or IT, do not respond to anecdotes. They respond to a figure they can weigh against the cost of fixing the problem.
The Studio Chaos Calculator, built from more than a hundred studio visits, exists to produce exactly this number.
How the calculator works
The calculator starts with a handful of context questions: sets shot per day, average time from shoot to live, and the size of the team involved in getting a single product to market, from merchandising through to post production and copy.
From there, it walks through five categories, capturing hours lost per person per week, the number of people affected, and a blended hourly rate for each. Status chasing covers the time spent hunting for updates across emails, shared drives, and spreadsheets. Data reconciliation covers cross referencing briefs, shot lists, and asset trackers when there is no single source of truth. Rework covers reshoots, re-edits, and retouching fixes, including the disruption they cause beyond the hours themselves. Manual admin for creatives covers the file renaming, uploading, and version tracking that eats into time meant for actual creative work. Visibility overhead covers the time studio leads spend chasing status just to report it back to the business.
What the numbers tend to show
Across the studios Lets Flo has worked with, a medium sized team typically loses somewhere between two hundred and fifty thousand and seven hundred and fifty thousand pounds a year to the Studio Tax, with US rates running higher and EU rates slightly lower. One brand that went through the full process came out at roughly four hundred thousand pounds a year, a figure that gave its leadership team the case it needed to act. A rough rule of thumb Rich shares is that around two thirds of a studio's administrative overhead tends to disappear once the underlying issues are addressed.
Beyond the direct cost sits something harder to put a figure on. Late launches mean stock that should be selling at full price sitting idle instead. A team with no breathing room has no time for the experimentation that keeps a studio's output ahead of the curve. Both are real losses, even if they never show up as a clean line in the calculator.
Try it for yourself
The Studio Chaos Calculator is live now on the Lets Flo website, and it takes about five minutes to work through. Once you have a number, you can request a full breakdown of where the time is going, and the Lets Flo team is happy to walk through the results with you directly.
Episode five sets the stage. A later episode in the series will pick up where this one leaves off, looking at what it actually takes to close the gap and get a studio operating at its full potential.
Listen to the full episode of The Collective podcast.
"The problem is coordination, and every point where coordination breaks down adds another small cost."
Rich Summers
Episode five is a solo episode hosted by Rich Summers, with Johan Santos off that week. It follows on from Episode four, featuring Alison, former Net-a-Porter studio director, on scaling that studio from 30 to over 100 people.